A contractor walks in and orders cement, TMT bars, sand and gitti for one site. Can all of it go on one bill? Yes. Showing multiple GST rates in one invoice is completely normal under GST, and building-material dealers do it every day. What matters is that each line carries its own HSN code and rate, and that the tax is calculated and summarised correctly.
This guide shows how to lay out a mixed GST invoice, with a full worked example using 18% and 5% items, a rate-wise summary and round-off.
Can you show multiple GST rates in one invoice?
There is no rule that says one invoice must have one rate. Rule 46 of the CGST Rules lists what a tax invoice must contain, and several of those particulars are framed around each item supplied: description, HSN code, quantity and unit, taxable value, rate of tax and amount of tax under each head (CGST, SGST or IGST).
So a single invoice can carry cement at 18%, steel at 18% and sand at 5%, as long as each item's rate and tax are shown properly.
After GST 2.0 (effective 22 September 2025), the typical rates for a building-material yard are:
| Item | HSN | GST rate |
|---|---|---|
| Cement | 2523 | 18% |
| TMT bars / iron and steel bars | 7213 / 7214 | 18% |
| Natural sand | 2505 | 5% |
| Stone aggregate / gitti | 2517 | 5% |
| PVC pipes and fittings | 3917 | 18% |
| Cut and polished marble/granite slabs | 6802 | 18% |
For the full list, see our GST rate list.
What each line of a mixed GST invoice must show
Every item line should have:
- Description that is specific, for example "TMT bar Fe 500D 12 mm", not just "steel".
- HSN code. Under Notification 78/2020-Central Tax, from 1 April 2021, a business with aggregate turnover up to ₹5 crore in the previous year shows 4 digits; above ₹5 crore, 6 digits. Businesses up to ₹5 crore may skip HSN on B2C invoices. Our HSN code guide explains how to find yours.
- Quantity and unit: bags, kg, quintal, tonne, CFT or brass.
- Rate per unit and taxable value, after any discount on that line.
- GST rate for that line.
- Tax amount: CGST and SGST for a sale within your state, or IGST for a sale to another state.
The invoice must also carry the standard header details: your name, address and GSTIN, a serial number, date, the buyer's details (and GSTIN for a registered buyer), and place of supply. For the full format, see how to make a GST bill.
Worked example: cement, steel, sand and gitti on one invoice
A contractor in the same state buys for one site. All prices are examples only, not market rates.
| # | Item | HSN | Qty | Unit | Rate (₹) | Taxable value (₹) | GST | CGST (₹) | SGST (₹) |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Cement PPC 50 kg | 2523 | 100 | Bag | 320.00 | 32,000.00 | 18% | 2,880.00 | 2,880.00 |
| 2 | TMT bar Fe 500D 12 mm | 7214 | 1.2 | Tonne | 55,000.00 | 66,000.00 | 18% | 5,940.00 | 5,940.00 |
| 3 | Natural sand | 2505 | 300 | CFT | 45.00 | 13,500.00 | 5% | 337.50 | 337.50 |
| 4 | Gitti 20 mm | 2517 | 200 | CFT | 52.50 | 10,500.00 | 5% | 262.50 | 262.50 |
For each line, the tax is taxable value × rate, split equally into CGST and SGST. For example, cement: ₹32,000 × 18% = ₹5,760, which is ₹2,880 CGST plus ₹2,880 SGST.
If this contractor's site were in another state, each line would show IGST at the full rate instead, for example ₹5,760 IGST on the cement line.
The rate-wise tax summary
Below the item lines, a clear invoice groups the tax by rate. This is what your CA and your buyer's accountant look at, and it matches how GST returns report supplies.
| GST rate | Taxable value (₹) | CGST (₹) | SGST (₹) | Total tax (₹) |
|---|---|---|---|---|
| 18% | 98,000.00 | 8,820.00 | 8,820.00 | 17,640.00 |
| 5% | 24,000.00 | 600.00 | 600.00 | 1,200.00 |
| Total | 1,22,000.00 | 9,420.00 | 9,420.00 | 18,840.00 |
Invoice total before round-off: ₹1,22,000 + ₹18,840 = ₹1,40,840.00.
Always check that the summary taxable value equals the sum of the item lines. If it does not, a line has the wrong rate or HSN.
Round-off on a mixed GST invoice
Section 170 of the CGST Act says tax and other amounts payable under the Act are rounded to the nearest rupee: 50 paise or more goes up, less than 50 paise is dropped.
On invoices, most businesses work out tax to the paisa on each line and then show a separate "Round off" line so the grand total is a whole rupee. Suppose a bill came to ₹48,731.42. You would show:
- Total: ₹48,731.42
- Round off: −₹0.42
- Grand total: ₹48,731.00
Keep the round-off on a separate line. Do not quietly adjust a taxable value or tax figure to hide the difference; your returns should match the line-level tax.
Mixed supply vs separate items: when one price changes everything
There is one trap. GST law has a concept called mixed supply (Section 2(74) of the CGST Act): two or more separate items sold together for a single price. Under Section 8(b), a mixed supply is taxed at the highest rate among its items.
For a building-material dealer, this matters if you sell a "package" at one lump sum, for example "complete material for one room: ₹50,000 all-inclusive" without breaking it up. Tax authorities could treat the whole amount at the highest rate in the bundle, which would be 18% even though part of it was sand at 5%.
The fix is simple: price and bill each item separately, with its own quantity, rate and HSN. Then each item takes its own GST rate. This is different from composite supply, where items are naturally bundled with one principal supply, such as goods with transport. Freight and loading charges are covered in our separate guide on freight in a GST invoice.
Common mistakes on multi-rate invoices
- One rate for the whole bill. Billing sand at 18% because "everything else was 18%" overcharges your customer. Billing steel at 5% underpays tax.
- Wrong HSN on a line, which leads to a wrong rate.
- Discount applied to the total, not spread to lines. If you give a lump-sum discount, the taxable value of each rate group must reflect its share; otherwise the rate-wise summary goes wrong. Line-level discounts are cleaner.
- Manual tax totals in a bill book that do not match the line totals.
- Missing e-way bill. For a consignment above ₹50,000 (check your state's intra-state limit), the e-way bill must reflect the invoice value. See our e-way bill guide.
In MaterialBill, each item in the master carries its own HSN and GST rate, so a bill with cement, steel and sand picks the right rate per line and splits CGST and SGST or IGST for you, with multi-unit billing for bags, tonnes and CFT on the same invoice.
GST rates and rules change; check the latest CBIC notification or ask your CA before filing.
Frequently asked questions
Is it allowed to show multiple GST rates in one invoice?
Yes. Rule 46 requires the description, HSN, taxable value, rate and tax for the goods supplied, so each line can carry its own rate on the same invoice.
Should I make separate bills for 5% and 18% items?
You do not have to. One invoice with line-wise rates and a rate-wise summary is fine. Some dealers split bills only for a customer's own accounting needs.
How do I calculate CGST and SGST on a mixed invoice?
For each line, multiply taxable value by the GST rate, then split it equally into CGST and SGST for a sale within your state. For an interstate sale, show the full amount as IGST.
What if I sell a material package at one lump-sum price?
That may be treated as a mixed supply and taxed at the highest rate in the package. Price each item separately to apply the correct rate to each.
Is round-off allowed on a GST invoice?
Yes. Section 170 provides for rounding to the nearest rupee. Show it as a separate round-off line on the invoice.
A mixed GST invoice is only hard when it is done by hand. If you want each line to pick its own HSN and rate and the tax to be split correctly on every bill, you can start free with MaterialBill's GST billing.