Home › Blog › GST rates and invoices › GST on Cement in 2026

GST on Cement in 2026: 18% Rate, HSN 2523 and Billing Examples

Quick answer

GST on cement is 18% in 2026. It was cut from 28% on 22 September 2025. The HSN code for cement is 2523.

Item HSN GST rate
OPC 33/43/53, PPC, PSC, white cement 2523 18%
In this article
  1. Cement GST rate 2026 at a glance
  2. How to calculate GST on a cement bag
  3. GST on cement freight, loading and unloading charges
  4. GST on cement bag sales above ₹50,000: e-way bill
  5. What dealers should check on old invoices (28% to 18%)
  6. Setting up cement billing correctly
  7. Frequently asked questions

GST on cement is 18% in 2026. It was 28% until 21 September 2025. From 22 September 2025 the rate came down to 18% after the 56th GST Council meeting, through Notification No. 09/2025-Central Tax (Rate) dated 17 September 2025. For a cement dealer this is the biggest tax change since GST started. It changes the tax on every bag, your counter rate and the way you handle stock and invoices from before the change.

This guide covers the rate, HSN code, per-bag tax maths, freight charges and old-invoice checks.

Cement GST rate 2026 at a glance

Item HSN GST rate from 22 Sep 2025 Earlier rate
Portland cement (OPC 33/43/53), PPC, PSC, white cement and other hydraulic cements 2523 18% 28%

All the usual cement types fall under heading 2523. That includes OPC (IS 269), PPC (IS 1489, fly-ash based) and PSC (IS 455, slag based). The rate does not change with the brand, grade or bag size.

On a GST invoice, the number of HSN digits you print depends on your turnover. Under Notification No. 78/2020-Central Tax, a business with aggregate turnover up to ₹5 crore in the previous financial year prints 4 digits (2523). A business above ₹5 crore prints 6 digits. If your turnover is up to ₹5 crore, you may leave out the HSN on invoices to unregistered buyers. If you are unsure what HSN is, our guide on what an HSN code is explains it simply.

How to calculate GST on a cement bag

A cement bag weighs 50 kg, and 20 bags make one tonne. Most dealers quote per bag, so it helps to know the tax per bag by heart.

The bag price below is a hypothetical example, not a market rate. Cement prices change by brand, town and week.

Worked example: intra-state sale (CGST + SGST)

A contractor in Patna buys 100 bags. Your example price is ₹350 per bag before GST.

Line Amount
Taxable value (100 bags × ₹350) ₹35,000.00
CGST @ 9% ₹3,150.00
SGST @ 9% ₹3,150.00
Invoice total ₹41,300.00

That is ₹63 of tax per bag at this example price (₹350 × 18%). Under the old 28% rate, the same bag would have carried ₹98 of tax.

Worked example: inter-state sale (IGST)

If the same 100 bags go from a godown in Bihar to a buyer registered in West Bengal, the place of supply is in another state. So you charge IGST instead of CGST and SGST.

Line Amount
Taxable value ₹35,000.00
IGST @ 18% ₹6,300.00
Invoice total ₹41,300.00

The total is the same; only the split changes. Charging the wrong type means corrections later.

Working back from a tax-inclusive bag price

Many counter customers ask for the "all-in" rate. To find the taxable value from an inclusive price, divide by 1.18. If the all-in example rate is ₹413, the taxable value is ₹413 ÷ 1.18 = ₹350, and the GST is ₹63. Do not take 18% of ₹413 and subtract it. That gives the wrong taxable value.

GST on cement freight, loading and unloading charges

Dealers often add delivery, loading or unloading to the cement bill. The usual position is:

Practical tip: put freight as a separate line on the invoice for clarity, but apply 18% to it when it is part of your cement sale. Advance rulings bind only the parties involved, so ask your CA if you use a goods transport agency (GTA) or have an unusual arrangement. For costing freight per bag or per trip, see our transport and freight costing guide.

GST on cement bag sales above ₹50,000: e-way bill

An e-way bill is generally required when the consignment value goes over ₹50,000. A truck of 200 bags crosses that limit easily, even at modest prices. Some states set a different limit for movement within the state, so check your state's limit. Our step-by-step guide on how to make an e-way bill covers the process.

What dealers should check on old invoices (28% to 18%)

The rate change does not reach back in time. An invoice correctly raised at 28% before 22 September 2025 stays at 28%. Points to review:

  1. Supplies that straddle the date. Section 14 of the CGST Act decides the rate when the supply, invoice and payment fall on different sides of the change date. In short, look at three events: when the goods were supplied, when you issued the invoice and when you received payment. If two of the three happened before 22 September 2025, the old rate usually applies. If two happened on or after that date, the new rate usually applies. The GST Council's FAQ on the 56th meeting changes confirms that advances and incomplete supplies follow Section 14.
  2. Advance bookings. If a customer paid an advance in September and took delivery in October, check the dates of payment and invoice against Section 14 before you decide the rate.
  3. Stock bought at 28%. The GST Council FAQ says input tax credit already in your electronic credit ledger can still be used to pay output tax, so selling old stock at 18% does not by itself mean you lose that credit. Ask your CA about your case, especially if you have a large balance of credit left over.
  4. Item master. Make sure every cement item in your billing software now shows 18%. One item left at 28% means overcharging customers and errors in your GSTR-1.
  5. Returns and credit notes on pre-change sales. A sales return against a 28% invoice needs care. Ask your CA which rate to use on the credit note before you issue it.

GST rates and rules change; check the latest CBIC notification or ask your CA before filing.

Setting up cement billing correctly

A few habits prevent most cement GST mistakes:

In MaterialBill's cement shop billing software, the HSN and GST rate sit on the item master and the daily rate update changes only the price, so a counter boy cannot accidentally bill cement at the wrong rate. You can see the current rates for other materials on our GST rates page.

Frequently asked questions

What is the GST rate on cement in 2026?

Cement under HSN 2523 is taxed at 18%. The rate has applied since 22 September 2025, when it was cut from 28% under Notification No. 09/2025-Central Tax (Rate).

What is the HSN code for cement?

The HSN heading is 2523. It covers Portland cement, PPC, slag cement, white cement and other hydraulic cements. Businesses with turnover above ₹5 crore must print 6 digits on invoices. Check the exact 6- or 8-digit code for your product with your supplier's invoice or your CA.

How much GST is there on one cement bag?

It is 18% of the bag's taxable value. At an example price of ₹350 before tax, the GST is ₹63 per bag (₹31.50 CGST + ₹31.50 SGST, or ₹63 IGST for inter-state sales). Your actual tax depends on your actual selling price.

Is GST charged on freight in a cement bill?

If you sell the cement and deliver it as one deal and charge freight on your invoice, it is generally a composite supply and the freight takes the 18% cement rate. If the buyer hires and pays the transporter directly, it is not part of your invoice. Confirm unusual arrangements with your CA.

Do I need to revise invoices raised at 28% before 22 September 2025?

No. Invoices correctly raised before the change stay at 28%. Only supplies with a time of supply on or after 22 September 2025 get 18%. Use Section 14 rules for cases that straddle the date.

Cement billing is simpler when the rate, HSN and per-bag maths are built into your bills. MaterialBill handles bag-wise billing and CGST/SGST/IGST splits, and exports the e-way bill details as a JSON file for the e-way bill portal, and you can start free to see if it suits your shop.

Related articles

GST on TMT Bars and Sariya GST on Sand, Gitti and Stone Aggregate GST on Bricks Explained GST on Marble and Granite After GST 2.0 GST on Tiles and Sanitaryware GST on Paint, Wall Putty and Waterproofing Products All blog posts

Start Free Today

Set up in two minutes. No card required. Leave whenever you like — your data always stays yours.