Cement and steel rates can move several times a month, sometimes several times a week. Hardware prices change less often but across thousands of items. If you are wondering how to price building materials so that margin survives these swings, the answer is not a secret percentage. It is a method: know your true landed cost, add the hidden costs, decide your markup, and update rates quickly when costs change.
This guide walks through that method with clearly labelled example numbers. The figures are illustrations only. They are not market prices or typical margins; use your own purchase bills.
How to price building materials: start with landed cost
The rate on the company's bill is only the start. Your real cost per bag or per tonne is the landed cost, meaning everything you spend to get the material into your yard and ready to sell:
- Basic purchase price (taxable value)
- Freight from depot or plant to your yard
- Loading and unloading (hamali)
- Handling loss: torn bags, cutting waste, weight shortfall
- Any other direct cost: toll, weighbridge charges, godown rent share
Leave out GST if you are registered and claim input tax credit, because that GST is recovered. If you pay tax on some cost that you cannot claim as credit, include it.
Worked example: cement landed cost per bag
Example figures only.
| Cost item | Basis (example) | Per bag |
|---|---|---|
| Basic price (taxable) | ₹300 per bag | ₹300.00 |
| Freight | ₹900 per tonne ÷ 20 bags | ₹45.00 |
| Loading | ₹3 per bag | ₹3.00 |
| Unloading | ₹3 per bag | ₹3.00 |
| Subtotal | ₹351.00 | |
| Handling loss allowance | 0.5% of bags | ₹1.76 |
| Landed cost | ₹352.76 |
A cement bag is 50 kg, so 20 bags make one tonne. That is how freight per tonne becomes freight per bag. The handling loss line spreads the cost of the few bags you cannot sell over the ones you can: ₹351 ÷ (1 − 0.005) = ₹352.76.
For a full freight costing method, see our guide on transport and freight costing.
Add the cost of credit
Most material in this trade goes out on udhaar. Money stuck with customers has a cost, whether it is interest on your bank limit or money you could have used elsewhere.
Using an example cost of money of 12% a year:
- 30 days' credit on ₹352.76 = 352.76 × 12% × 30 ÷ 365 = ₹3.48 per bag
- 60 days' credit = ₹6.96 per bag
So a contractor who pays in 60 days costs you about ₹3.48 per bag more than one who pays in 30 days, at these example numbers. Over a few thousand bags that is a real amount. Your udhaar records show who actually pays when; price accordingly.
Markup vs margin: know which one you mean
Many pricing mistakes come from mixing these up.
- Markup is profit as a percentage of cost.
- Margin is profit as a percentage of the selling price.
On a cost of ₹100, a 10% markup gives a price of ₹110, which is a margin of only 9.09%. To earn a 10% margin, you would need to price at ₹111.11.
Worked example: from landed cost to selling price
Continuing the cement example, with a 30-day credit customer and an example markup of 6%:
| Step | Per bag |
|---|---|
| Landed cost | ₹352.76 |
| Add 30-day credit cost | ₹3.48 |
| Cost including credit | ₹356.24 |
| Add 6% markup | ₹21.37 |
| Selling price before GST | ₹377.61 |
| GST at 18% (HSN 2523) | ₹67.97 |
| Price including GST | ₹445.58 |
Again, 6% is an example to show the method, not a recommended or typical margin. Our guide on how to calculate profit margin covers margin targets and checking real profit from your books.
Steel: pricing by weight
Steel is priced per tonne or per kg, but often sold by the bar. Build the landed cost per tonne first, then convert.
Example figures only:
| Item | Per tonne |
|---|---|
| Basic price (taxable) | ₹52,000 |
| Freight | ₹800 |
| Loading/unloading | ₹300 |
| Subtotal | ₹53,100 |
| Handling/cutting loss allowance (0.3%, grossed up) | ₹159.78 |
| Landed cost | ₹53,259.78 (≈ ₹53.26 per kg) |
With an example 3% markup, the price is about ₹54.86 per kg before GST. A 12 mm TMT bar weighs 0.888 kg per metre, so a standard 12 m bar is 10.656 kg. At ₹54.86 per kg that bar comes to about ₹584.59 before GST. TMT bars are taxed at 18%.
Whether you bill by actual weight or by standard weight per bar affects your margin too. See sariya rate and billing for that discussion.
When rates change: replacement cost thinking
Suppose you have 100 bags in stock at a landed cost of ₹351 (example), and the company raises the rate so that new stock will land at ₹366.
- Pricing old stock at 6% on its old cost: ₹372.06
- Pricing at 6% on the new replacement cost: ₹387.96
The gap is ₹15.90 a bag. Many dealers price on replacement cost when rates rise, because the money from today's sale has to buy tomorrow's stock at the new rate. When rates fall, competition usually forces prices down anyway. How you handle this is a business decision; the point is to decide it deliberately, not by accident.
Update rates the same day
The most common margin leak is not a wrong markup but a stale rate. The company rate went up on Monday, and the counter staff kept billing the old price until Thursday. To avoid this:
- Update the item master rate the same day you get a new company rate.
- Keep one person responsible for rate updates.
- Share an updated price list with regular customers so they are not surprised.
Party rates without losing control
Contractors and builders expect special rates. That is normal, but it should be planned:
- Set party rates as a difference from your list rate, for example "₹5 below list", so they move automatically when list rates change.
- Link the discount to payment behaviour. Someone who pays in 15 days may deserve a better rate than someone who takes 75 days.
- Put an expiry on locked rates. A project rate agreed three months ago should not keep running forever.
- Review monthly. Compare each big party's rate against their payment record and volume.
Pricing hardware: many items, small amounts
Hardware is different. Individual amounts are small, but there are thousands of items, and rates change in steps rather than daily.
- Group items by category and set a markup per category, rather than item by item.
- Update a whole category when a brand sends a new price list.
- Watch slow movers. Items that sit for a year tie up money; their effective margin is lower than it looks.
- Use rounded counter prices for small items, so staff do not need to calculate.
How a billing app helps
MaterialBill lets you keep daily rate updates on the item master, party-wise agreed rates and a shareable price list, so new rates reach the counter and regular customers the same day. Multi-unit billing lets you buy in tonnes and sell in kg or by bar from the same item. For steel dealers, the sariya and steel billing software page shows how size-wise stock and rates work together.
GST rates and rules change; check the latest CBIC notification or ask your CA before filing.
Frequently asked questions
What margin should I keep on cement or steel?
There is no single correct figure; it depends on your costs, credit period, competition and volume. Work out your true landed cost and credit cost first, then decide a markup that covers your overheads and leaves profit.
Should freight be included in my selling price or charged separately?
Either can work. If you deliver, you can build freight into the rate or show it on the bill. Either way, make sure it is covered. For how GST applies to freight on an invoice, ask your CA.
How do I handle a customer who wants last week's rate?
Decide a clear policy: quotations valid for a set number of days, and rates as on the date of billing after that. Write the validity on the quotation.
Is markup or margin better for pricing?
Use whichever you prefer, but be consistent and know the difference. A 10% markup is only about a 9.09% margin.
How often should I update hardware prices?
Whenever a supplier sends a new price list, and review slow-moving items at least every few months.
Good pricing is mostly discipline: true costs, same-day rate updates and planned party rates. If you want rates, party prices and price lists in one place, you can start free with MaterialBill and load your top items first.