When cement and saria rates move every week, customers want certainty. A builder starting a slab next month asks, "Aaj ka rate lock kar do, advance de deta hoon." A good advance booking for cement and steel can win you the order and the customer's loyalty. A badly recorded one can leave you supplying at last month's rate after your own purchase cost has gone up, with no clear proof of what was agreed.
This guide explains how to structure a rate-lock booking, what to write on the booking receipt, how to record the advance, how GST timing works for goods, and how to handle partial deliveries and cancellations.
What a rate lock actually means
A rate lock is a promise: "For this quantity, delivered within this period, I will charge this rate, whatever the market does." It is a commercial risk you take on. If market rates rise, you lose on that booking. If they fall, the customer may want to cancel or renegotiate.
So a rate lock is only safe when four things are clear and written:
- Quantity. How many bags or tonnes, of which brand, grade and size.
- Rate and what it includes. Per bag or per kg, GST extra or inclusive, freight and loading included or not.
- Validity. The last date by which the customer must take delivery at this rate.
- Advance and conditions. How much is paid now, and what happens to it on cancellation, delay or rate changes.
Decide your booking rules before the customer asks
Have a standard policy, so the counter staff do not invent terms on the spot. A simple policy might look like this (adjust to your business):
| Term | Example policy |
|---|---|
| Minimum booking | Only for orders above a set quantity |
| Advance | A fixed % of order value, paid by bank or UPI |
| Rate validity | Fixed days from booking date |
| Delivery window | Customer must call for delivery within validity |
| After validity | Undelivered balance billed at the rate on the day of delivery |
| Cancellation | Advance refunded or adjusted, as stated on the receipt |
| Brand / size change | Treated as a new booking at the current rate |
Keep validity short for items whose rates swing a lot. Steel rates can move faster than cement, so many dealers give steel a shorter lock than cement. That is a business choice, not a rule. Check how your own supplier gives you rates: if your supplier will not hold a rate for you for 30 days, do not hold one for your customer for 30 days.
Advance booking for cement and steel: the receipt
The receipt is your evidence. Make it a proper document, not a line in a diary:
- Customer name, phone, GSTIN (if any) and site address
- Booking date and booking number
- Item-wise quantity, brand, grade and size (e.g. OPC 53, 10 mm Fe 500D)
- Locked rate per unit, and whether GST, freight and loading are included
- Total order value at the locked rate
- Advance received: amount, mode and reference number
- Validity date and what happens after it
- Cancellation and refund terms
- Signature or WhatsApp confirmation from the customer
Many dealers issue a quotation with the locked rate and validity, then record the advance as a payment receipt against it. This keeps the agreed terms and the money in one trail.
GST on advances for goods: what changes and what does not
This is the part dealers most often get wrong.
For goods, a regular registered dealer generally does not have to pay GST at the time of receiving an advance. Under CBIC's Notification No. 66/2017-Central Tax (November 2017), registered persons other than composition dealers pay GST on goods at the time of issuing the invoice, not on receipt of advance. Cement and steel are goods, so the tax point is usually the invoice.
What this means for you:
- On booking: issue a receipt voucher or advance receipt for the money. Do not charge GST on the advance itself for goods.
- On delivery: issue a tax invoice for the quantity delivered, at the locked rate, with GST at the rate in force on the invoice date.
- The advance is adjusted against the invoice as a payment.
For services (for example, if you separately book a crane or a hiring service), the rules on advances are different. Ask your CA.
If the GST rate changes between booking and delivery, the rate at the time of supply applies, and the rules for that are specific. Cement moved from 28% to 18% on 22 September 2025, which caught many open bookings in between. If a rate change happens during an open booking, talk to your CA before invoicing. Our GST billing guide covers the basics of a correct invoice.
GST rates and rules change; check the latest CBIC notification or ask your CA before filing.
Worked example: booking, partial delivery and final bill
All rates below are illustrative, not market prices. Assume cement is taxed at 18% and is billed intra-state (CGST 9% + SGST 9%).
Booking (Day 1) - Customer books 400 bags of cement at a locked rate of ₹350 per bag taxable value (an example figure only). - Order value at locked rate: 400 × ₹350 = ₹1,40,000 taxable; GST 18% = ₹25,200; total ₹1,65,200. - Advance received: ₹50,000 by UPI. Receipt issued. No GST charged on the advance (goods). - Validity: 20 days.
First delivery (Day 6): 150 bags - Invoice: 150 × ₹350 = ₹52,500 taxable + ₹9,450 GST = ₹61,950 - Advance adjusted: ₹50,000. Customer pays ₹11,950 or it goes to udhaar. - Advance balance: ₹0. Booking balance: 250 bags at locked rate.
Second delivery (Day 14): 200 bags - Invoice: 200 × ₹350 = ₹70,000 taxable + ₹12,600 GST = ₹82,600 - Booking balance: 50 bags.
After validity (Day 25): 50 bags - Validity expired on Day 20. As per the receipt, the balance 50 bags are billed at the day's rate.
| Event | Bags | Billed at | Booking balance |
|---|---|---|---|
| Booking | 400 | Locked rate | 400 |
| Delivery 1 | 150 | Locked rate | 250 |
| Delivery 2 | 200 | Locked rate | 50 |
| Delivery 3 (after validity) | 50 | Day's rate | 0 |
Each delivery should have its own delivery challan and invoice, linked to the same booking, so the customer and you see the same running balance.
Handling cancellations and rate falls
Customer cancels before any delivery: refund or adjust the advance as per the receipt terms. If you had already bought stock for the booking, that is your risk unless your terms say otherwise.
Market rate falls below the locked rate: the customer may ask for the lower rate. Your written terms decide. Some dealers pass on part of the fall to keep a good customer; that is a goodwill choice. Whatever you decide, put it in writing on the next invoice.
Customer does not take delivery for months: your validity clause protects you. Send a reminder before validity ends, with the balance quantity and the date.
Advance lying unused: treat it as a liability you owe the customer, not as your income. Show it in the customer's ledger as a credit balance until it is adjusted or refunded. Your party statement should show it clearly.
Protect yourself: link bookings to your purchase side
A rate lock to a customer is safest when it is backed on the purchase side:
- Book with your supplier too, at a known rate, for at least the locked quantity.
- Reserve the stock in your godown records so it is not sold at the counter.
- Track open bookings daily: total locked quantity, average locked rate, and today's purchase cost. If the gap turns against you, stop new locks.
A simple sheet or report of open bookings by item, quantity and validity date is enough. Our profit margin guide shows how to check margin on locked-rate sales.
Frequently asked questions
Do I have to pay GST on an advance for cement or steel?
For goods, a regular registered dealer generally pays GST when the invoice is issued, not when the advance is received. Composition dealers and services have different rules, so confirm with your CA.
What should a rate-lock booking receipt include?
Customer details, item, brand, grade, quantity, locked rate, what the rate includes, advance amount and mode, validity date, what happens after validity, and cancellation terms.
How long should I lock a rate for?
Only as long as your own supplier holds your purchase rate, and shorter for items that move faster. Many dealers keep steel locks shorter than cement locks.
What happens if the GST rate changes during an open booking?
Special time-of-supply rules apply when rates change. Speak to your CA before invoicing open bookings after a rate change.
How do I show an unused advance in my books?
As a credit balance in the customer's ledger, a liability, until you adjust it against an invoice or refund it.
Rate locks work when the terms are written and every delivery is tracked against the booking. If you run a cement shop, you can start free with MaterialBill and keep quotations, advance receipts, challans and invoices linked to the same party.